29th September 1979
L.N.E.R. Society
Railtours
The Caledonian
Loco(s) Used | ??? |
Route :
Loco(s) | Route |
????? | London Euston - (via WCML, ?Weedon & Trent Valley?) - Glasgow Central |
????? | Glasgow Central - (via WCML, ?Trent Valley & Weedon?) - London Euston |
Notes :
(1) Off train options were as follows;
Group 1: will have almost 5 hours for optional sight-seeing in Glasgow.
GROUPS 2-3-4 & 5 JOIN THEIR ROAD COACHES IN HOPE STREET TO THE LEFT OF GLASGOW
CENTRAL STATION ON ARRIVAL AND RUNNING PARALLEL TO THE STATION BUILDINGS
Group 2: joins coaches for Balloch, Loch Lomond, Tarbet, Arrochar and
Loch Long; continuing through Argyll Forest Park, Glen Croe, Loch Fyne, Strachur
Bay, Loch Eck, Holy Loch, Dunoon and across the ferry to Gourock and Glasgow
Central 17.00
Group 3: joins coaches for Campsie Fells, Kippen, Arnprior, Lake of
Mentieth, Aperfoyle and over the Duke's Pass to the Trossachs and Loch Katrine;
returning via Loch Achray and Loch Venachar to Callandat, Doune, Stirling and
Glasgow Central 17.00
Group 4: joins coaches for the Scottish Railway Preservation Society at
Falkirk (13.45-14.45); returning to Glasgow Transport Museum (15.45-16.45) and
Glasgow Central 17.00
Group 5: joins buses for the British Rail Engineering Works at St. Rollox
(13.00-14.30); returning to Glasgow Central where you can either leave the tour
or continue to the Glasgow Transport Museum (15.45-16.45) and Glasgow Central
17.00
Jon Wade's tickets for the tour.
Sources : Robin Edwards & Jon Wade
Timings (Booked Only)
(from Jon Wade)
Location | Booked (out) | Booked (rtn) |
Euston | 06.30d | 23.42a |
Harrow & Wealdstone | ??.??a ~ 06.44d | 23.25a ~ ??.??d |
Watford Junction | ??.??a ~ 06.52d | 23.19a ~ ??.??d |
Bletchley | ??.??a ~ 07.16d | 22.57a ~ ??.??d |
Rugby | ??.??a ~ 07.45d | 22.27a ~ ??.??d |
Glasgow Central | 12.22a | 17.20d |