14th - 15th September 1985
Diesel & Electric Group
The Night Ferry Voyager
Tour cancelled a month before for reason(s) unkown.
Route :
Date | Proposed Traction | Proposed Route |
14/09 | Hastings Unit | London Victoria - Orpington - Tonbridge - Dover - Dunkirk - Paris |
14/09-15/09 | Hastings Unit | Paris - Dunkirk - Dover - Tonbridge - London |
Notes :
(1) Would have used the train-ferry. Was re-dated from an earlier date as this
was the only time available before the train ferry was to lose its passenger
license. It was suggested the train would leave London between 4.30 and 5am and
there woudl be 8 hours in Paris. The return would use the 03.00 train ferry from
Dunkirk meaning an arrival back into London around 8am.
Sources : Nick Bartlett & Gary Thornton
Back to "The Railtour Files"