14th - 15th September 1985
Diesel & Electric Group
The Night Ferry Voyager
Tour cancelled a month before for reason(s) unkown.
Route :
| Date | Proposed Traction | Proposed Route | 
| 14/09 | Hastings Unit | London Victoria - Orpington - Tonbridge - Dover - Dunkirk - Paris | 
| 14/09-15/09 | Hastings Unit | Paris - Dunkirk - Dover - Tonbridge - London | 
Notes :
(1) Would have used the train-ferry. Was re-dated from an earlier date as this 
was the only time available before the train ferry was to lose its passenger 
license. It was suggested the train would leave London between 4.30 and 5am and 
there woudl be 8 hours in Paris. The return would use the 03.00 train ferry from 
Dunkirk meaning an arrival back into London around 8am.
Sources : Nick Bartlett & Gary Thornton

 Back to "The Railtour Files"
Back to "The Railtour Files"